BERITA - CHINA LG SUPPLY

GET A QUICK QUOTE

SELAMAT DATANG

QINGDAO LG RIGGING CO., LTD
middlelogo

QINGDAO LG RIGGING CO.,LTD. ,which was called CHINA LG SUPPLY for short, is located in the largest rigging hardwares production base – Shandong, China.We acquired ISO9001 quality management and SGS quality management.
Dengan pengalaman lebih 15 tahun dalam pengeluaran penipuan, China LG Supply mempunyai tradisi yang panjang perkhidmatan yang sangat baik, harga yang kompetitif dan komitmen yang tinggi terhadap kualiti.

Sebagai tambahan kepada produk yang ditunjukkan dalam katalog kami, kami menawarkan satu barisan penuh gear perikanan pukat tunda, perkakasan marin, mengangkat & perkakasan penipuan dan semua produk yang berkaitan. rangkaian lengkap penyelesaian mengangkat disesuaikan dengan keperluan individu anda.
90% produk kami telah mengeksport ke Jerman, Australia, Amerika Syarikat, Itali, Sweden dan lain-lain pasaran Eropah dan Amerika.

kATEGORI PILIHAN

PRODUK PILIHAN

BAGAIMANA UNTUK ?

How to install and use U Bolt?

How to install and use U Bolt?

 

A U-Bolt is a U-shaped bolt with two threaded arms that extend up from a curved or square base. The special “U” shape of the bolt provides U-Bolts with a great deal of extra stability.

An U Bolt is commonly a type of fastener used in business construction to append any threaded rod or bolt accessory to concrete. After installing it, you will now be left with female threads in the binding material, featuring either threaded rod or bolts.

 

How to install an U Bolt?

Follow these five steps to ensure your U-bolt is installed correctly.

Step 1: Remove the Nuts
The U-bolt will probably come with nuts attached to its threads. Start by taking the nuts off each side of the bolt.

Step 2: Position the U-Bolt
Place the U-bolt around the object you’re attaching to the beam or support. This object is usually piping or tubing.

Step 3: Examine Your Holes
Next, make sure you properly drill holes through the support structure. If you’ve drilled through the beam, make sure you haven’t damaged its protective coating. Cracks in the coating can lead to rusting around holes. At this stage, it’s smart to touch up the beam’s surface around holes before adding your bolts.

Step 4: Thread the Bolt Through
Push the two bolt ends through the holes and thread the nuts on each end of the U-bolt.

Step 5: Fasten the Nuts
It’s good to note that nut placement on a restraint will be different from a guide. If you’re working with a restraint, you’ll want to tighten the nuts on the bottom side of the beam.

For guides, you’ll want to place one nut on the top side of the beam and one nut on the bottom side. These nuts allow proper spacing between the piping and U-bolt.

Once your nuts are in place, start by hand tightening the nuts closest to the beam first. Finally, tighten each end’s second nut. This will lock the U-bolt in place. Then, use a power tool or wrench to tighten the nuts until they’re secure.

 

Please browse our stainless steel U bolts selection below,

How to install and use U Bolt

Stainless Steel U Bolt TPN Type with 2 Plates & Nuts

 

 

More stainless steel U bolts

 

Jika anda memerlukan bantuan menentukan perhimpunan atau saiz yang betul untuk permohonan anda, e-mel kepada pakar kami disales@lg-lifting.com for assistance. 🙂

How To Plan A Shade Sail Structure – Shade Sail Installation

How To Plan A Shade Sail Structure – Shade Sail Installation

 

How To Plan A Shade Sail Structure?

Sunshade sails can be placed in a variety of ways:

  1. Horizontally,where all corners are at the same height;
  2. Vertically,like a privacy fence;
  3. Slants & Angles with overlapping sails;
  4. Or,where some corners are high and some low.

 

You probably already have an idea of what you want to cover or what you want to design.If you haven’t decided yet, here are some ideas for a single or multiple design looks.

 

 

A horizontal sail can be boring to look at, while a totally vertical sail could catch more wind and could produce heavier loads.

The most visually appealing situation is when two or more shade sails are used and the mounting elevations of the sails change dramatically from corner to corner.

Setting mounting points 3ft or more change in height makes for a visually stunning look.

Prior to installation, check with local authorities for any relevant building regulations which may exist, and check with the local utility companies for any underground services prior to digging holes for the support posts.

Where To Place The Shade Sail?

Before you commence installation, it is very important that you consider the most suitable location for your shade sails. Take into account the following:

  1. Size of the shade sail(s);
  2. Strength of existing structures intended to be anchor points;
  3. Ability to insert suitable fixing posts;
  4. Location of barbecue grills, fire pits, and other high heat sources;
  5. Sun direction and path tracking;
  6. Wind speeds typical and maximum expected for your area.

 

Find a suitable anchor point for each corner of the shade sail, such as those listed below. These need to be strong enough to take the strain of the shade sail material when tensioned.
Anchor points could be:

  1. A wall or strong beam
  2. A suitable tree
  3. A wooden post at least 100mm diameter set in the ground.
  4. A metal pole at least 48mm diameter set in the ground.
  5. A metal pole at least 48mm diameter fitted into a sleeve in the ground, like a rotary washing line.

Fixing points should be at least 7ft 10inches above the ground, and it is extremely important that these are sufficiently strong to take the full weight of the shade sail in windy conditions.

The wind can add significantly to the stress of the shade sail on any fixings, so it is vital to be certain that they can stand the additional drag.
NB: If you have any doubts you should take advice from a builder or structural engineer.

Posts

If you need to install posts, these should be 48mm wide galvanised steel which is 4mm thick (these can be easily painted if required).

Posts should be angled away from the centre of the shade sail by at least 10 degrees to provide additional strength and stability.

Footings
Footings for posts for shade sails up to 16ft 5inches should be 400mm square and 800mm deep and this should increase to 400mm x 1200mm for larger sizes.

Foundations
Concrete
Concrete should be well packed down around the post and sloping slightly outwards at the top to ensure water does not collect around the post. This should be left for a minimum of 48 hours to allow it to set completely before you attach the shade sail. We do not recommend the use of rapid set concrete.
1. Firm ground
Lay a 100mm depth of 20mm gravel at the base of the post. Add concrete and brace post on the angle.
2. Soft ground
Pour a 100mm depth of concrete at the bottom of the hole to provide a solid pad. Allow this to set. Add the gravel at the base of the post. Add concrete and brace post on the angle.

Wall

Once you have decided on a suitable site, the shade sail should be laid out in position on the ground allowing an additional 10% at each corner for tensioning.

For larger gaps you may require stainless steel cable or similar to reach more distant fixing points.

Trees

If you decide to use a tree as a fixed point, it should be at least 250mm in diameter.

How To Set It Up?

Some possible combinations of fixing accessories

Connecting the sail shade
Connect fixing accessories to your mounting points as required.Ensure all accessories face towards the middle of the sail and are tightly secured.

Tensioning
To connect your sail shade you should first attach the adjustable fixings to the mounting points(ensuring they face the centre of the sail shade),and then attach the sail shade to these,using a strap temsioner to stretch the sail shade as tightly as possible,replacing this with a turnbuckle for final tensioning and adjustment.

Please browse our shade sail hardware selection below,

Important : at least two of the sail’s fixing accessories must be tensioning devises.

A rope or chain can be used extend you shade sail to a fixing point if required.Select the fixing accessories which best suit your own installation.


Stainless Steel Commercial Turnbuckle Hook/Hook European frame type China manufacturer supplier

Trunbuckle : To attach shade sail corner ring to a fixing point and provide tension on the shade sail.


Stainless Steel D Shackle

Shackle : Use to link shade sail corner to pad eye or eye bolt.


Stainless Steel Diamond Pad Eye Plate

Pad eye : To attach shade sail corner ring to a wall in conjunction with D shackle.


s hook stainless steel

S hook : Use to link shade sail corner to pay eye or eye bolt.


Plain Eye Bolt

Eye bolt : To attach shade sail corner ring through a thimber stud,steel pole or slid support.


Snap Hook DIN5299 Form C Stainless Steel

Snap hook : Used to link shade sail corner to pad eye or tempcrary use.


Stainless Steel 304/316 Swage Jaw Terminal swage socket

Terminals : We offer a range of terminals that are safe, reliable, and do not require any specialised swaging or crimping tools.


Stainless Steel Rigging Screws Jaw To Swage Stud aisi 316 China manufacturer supplier

Rigging screws : Rigging screws are designed to conceal the threads within the pipe for a better, more streamlined appearance to your shade sail rigging,designed to attach to a wide range of stainless steel fixtures and fittings, such as screw eyes and eye bolts.


Shade Sail Hardware Kit Mounting Hardware Stainless Steel China manufacturer

Shade Sail Hardware Kit :

Triangle type set includes:2 x Turn Buckles,3 x Pad Eyes,3 x Carabiner,12 x Screws for fixing eye plates;
Square type set includes:2 x Turn Buckles,4 x Pad Eyes,2 x Carabiner,16 x Screws for fixing eye plates.


 

 

 

Jika anda memerlukan bantuan menentukan perhimpunan atau saiz yang betul untuk permohonan anda, e-mel kepada pakar kami disales@lg-lifting.com for assistance. 🙂

JANGAN MELEBIHI BEBAN KERJA LIMIT

JANGAN MELEBIHI BEBAN KERJA LIMIT

 

 

Bekerja Had muatan
Ini adalah istilah yang digunakan di seluruh katalog. Terdapat, bagaimanapun. Syarat-syarat lain yang digunakan dalam industri yang boleh ditukar dengan Had Beban Kerja istilah. Ini adalah: WLL, SWL, Peti Beban Kerja, Popular Beban Nilai, Mengakibatkan Beban Kerja Selamat dan Popular Capacity.

 

Jangan sekali-kali melebihi Had Beban Kerja.

The Kerja Beban Had adalah beban maksimum yang pernah patut diterapkan pada produk, walaupun produk baru dan apabila beban seragam digunakan - garis lurus tarik sahaja. Mengelakkan loading sampingan. Semua penilaian katalog adalah berdasarkan keadaan persekitaran biasa, dan pertimbangan perlu diberikan kepada keadaan luar biasa seperti tinggi yang melampau atau suhu rendah, penyelesaian kimia atau wap, rendaman berpanjangan dalam air garam, dan lain-lain Syarat-syarat tersebut atau aplikasi yang berisiko tinggi mungkin memerlukan mengurangkan bekerja Had Beban.

 

Kimpalan dan Pengubahsuaian Menjejaskan Had Beban Kerja

Beban kerja Had tidak akan digunakan jika produk telah dikimpal atau diubahsuai sebaliknya. Ia juga harus diperhatikan bahawa ia adalah tanggungjawab muktamad pengguna akhir untuk menentukan Had Beban Kerja bagi setiap permohonan.

 

Komponen Kerja Had muatan mesti sepadan.

Memastikan bahawa komponen seperti cangkuk, pautan atau belenggu, dan lain-lain digunakan dengan tali dawai (atau rantai atau temali) adalah saiz bahan yang sesuai dan kekuatan untuk memberi perlindungan keselamatan yang mencukupi. Lampiran mesti dipasang dengan betul dan mesti mempunyai Had Beban Kerja sekurang-kurangnya sama dengan produk yang mereka digunakan. Ingat: Mana-mana rantai hanya sekuat link paling lemah.

 

beban dibangkitkan.

Semua pekerja yang bekerja dengan kren atau pesawat angkat atau membantu dalam hooking atau mengatur beban yang harus diarahkan untuk menjaga keluar dari bawah beban. Dari sudut pandangan keselamatan, salah satu faktor adalah paling utama: Menjalankan semua operasi mengangkat dengan cara seperti itu, bahawa jika terdapat kegagalan peralatan, tidak ada anggota akan cedera. cara ini mengelakkan dari di bawah beban yang dibangkitkan dan menjauhkan diri daripada garis kuasa mana-mana beban.

 

Terdapat banyak kejutan.

Elakkan memberi kesan, jerking atau berayun beban sebagai Had Beban Kerja boleh melebihi dan Beban Kerja Had tidak akan dikenakan. Satu beban kejutan biasanya jauh lebih besar daripada beban statik. beban kejutan mengelakkan.

 

Memeriksa produk secara teratur.

Tidak ada produk boleh terus beroperasi pada kapasiti undian selama-lamanya. pemeriksaan berkala membantu menentukan bila untuk menggantikan produk dan mengurangkan bahaya penipuan. Memeriksa kerosakan yang nyata, retak, haus, pemanjangan, karat, dan lain-lain Apabila ragu-ragu mengenai tahap kerosakan, bersara item yang berkenaan dengan segera.

rehat itu boleh menyebabkan beban gagal atau swing luar kawalan, mungkin mengakibatkan kecederaan serius atau kematian dan kerosakan harta benda utama.

 

Oleh itu:

➡ Jangan melebihi Had Beban Kerja (WLL).

➡ komponen padan dengan betul.

➡ Jauhkan dari bawah beban yang dibangkitkan.

➡ beban kejutan Elakkan.

➡ Memeriksa produk secara teratur.

Wire Rope Panduan Klip Installation

Wire Rope Panduan Klip Installation

 

 

klip tali dawai digunakan secara meluas untuk membuat penamatan akhir. Klip boleh didapati dalam dua reka bentuk asas; U-Bolt dan cengkaman genggaman. Kecekapan kedua-dua jenis adalah sama.
Apabila menggunakan klip U-Bolt Berhati-diambil untuk memastikan bahawa mereka dilampirkan dengan betul; pemasangan yang tidak betul boleh mengurangkan had beban kerja sebanyak 40%. Berikut adalah garis panduan umum untuk memasang klip tali dawai.

 

Pertama, dawai klip tali hendaklah diperiksa sebelum digunakan untuk memastikan bahawa:

• semua tanda-tanda yang mudah dibaca;
• klip tali dawai bebas daripada nama samaran, gouges dan retak;
• klip tali dawai dengan dimensi yang betul telah dipilih;
• jangan pembaikan atau membentuk semula klip tali dawai oleh kimpalan, pemanasan atau dibengkokkan kerana ini boleh menjejaskan prestasi.

 

Dan kemudian, berikut ini adalah berdasarkan kepada penggunaan saiz yang betul klip U-Bolt pada tali baru.

Langkah 1. Hidupkan kembali dinyatakan jumlah tali dari bidal atau gelung. Klip pertama mesti diletakkan satu lebar jambatan dari ekor belakang tali bertukar atau buntu tali, Memohon U-Bolt lebih buntu tali dawai - jualah kesudahan hidup dalam pelana (! Jangan sekali-kali pelana kuda mati) Ketatkan kacang sama rata, alternatif dari satu nut kepada yang lain sehingga mencapai tork yang disyorkan.

Langkah 2. Apabila lebih daripada dua klip dikehendaki, memohon klip kedua sebagai berhampiran gelung atau bidal yang mungkin, mengetatkan kacang tegas tetapi tidak belum tork yang dinyatakan.

Langkah 3. Apabila tiga atau lebih klip diperlukan, ruang klip tambahan sama rata antara dua yang pertama - mengambil tali kendur - mengetatkan kacang pada setiap U-Bolt sama rata, seli dari satu nut kepada yang lain sehingga mencapai tork disyorkan.

Langkah 4. Memohon beban pertama untuk menguji perhimpunan. beban ini harus sama atau lebih - berat daripada beban dijangka digunakan. Seterusnya, semak dan ketatkan semula kacang untuk tork yang disyorkan.

Selaras dengan amalan baik penipuan dan penyelenggaraan, tali dawai akhir penamatan perlu diperiksa secara berkala untuk pakaian, penderaan, dan kecukupan umum. Dari semasa ke semasa semula mengetatkan kacang mesti dilakukan pada 10,000 kitaran (penggunaan berat), 20,000 contohnya setiap 3 bulan, 6 bulan, setiap tahun.

 

Juga, mengetatkan dan retightening daripada kacang pasti terlaksana seperti yang dikehendaki.
Menggunakan klip hanya palsu untuk kritikal, tugas berat, beban overhead, seperti garis sokongan, talian Lelaki, talian menunda, downs tali leher, perancah, dan lain-lain
klip mudah dibentuk akan digunakan untuk membuat perhimpunan penamatan mata hanya dengan hak tali dawai lay biasa dan hanya untuk kegunaan tugas ringan dengan beban gunaan kecil, seperti susur tangan, lawan pedang, rel pengawal, dan lain-lain

 

China LG Supply memberikan anda kualiti yang tinggi klip tali dawai, Dalam pelbagai saiz dan reka bentuk, mengikut keperluan dan keinginan anda.

contohnyawayar mudah dibentuk din741 klip tali,palsu klip tali dawai g-450, keluli tahan karat dawai klip tali.