NUNTII - China Lumen gentium SUPPLEMENTUM

Get a Quick Quote

SALUTATIO

Lumen gentium QINGDAO EXARMO CO., LTD
middlelogo

QINGDAO LG RIGGING CO.,LTD. ,which was called CHINA LG SUPPLY for short, is located in the largest rigging hardwares production base – Shandong, China.We acquired ISO9001 quality management and SGS quality management.
Et super XV annis 'experientia amisso clavo ad productionem, copia posta est Lumen gentium Sinis optimum longa traditio servitium, et competitive pretium laborum aeque susceptorum ad species.

In addition ut ostensum est in nostra products Catalogus nobis offerre plenus linea trawling calces, marine hardware, exaltatione & menta hardware et related products. Lorem rhoncus elevatis ad plenam singulis solutiones.
XC% of nostri products in Germania fuerat, ut esset educendi, Australia, Canada, Italia, et aliis Europae et American Suetia fora.

Featured Categories

PRODUCTI INSIGNITI

QUOMODO ?

How to install and use U Bolt?

How to install and use U Bolt?

 

A U-Bolt is a U-shaped bolt with two threaded arms that extend up from a curved or square base. The special “U” shape of the bolt provides U-Bolts with a great deal of extra stability.

An U Bolt is commonly a type of fastener used in business construction to append any threaded rod or bolt accessory to concrete. After installing it, you will now be left with female threads in the binding material, featuring either threaded rod or bolts.

 

How to install an U Bolt?

Follow these five steps to ensure your U-bolt is installed correctly.

Step 1: Remove the Nuts
The U-bolt will probably come with nuts attached to its threads. Start by taking the nuts off each side of the bolt.

Step 2: Position the U-Bolt
Place the U-bolt around the object you’re attaching to the beam or support. This object is usually piping or tubing.

Step 3: Examine Your Holes
Next, make sure you properly drill holes through the support structure. If you’ve drilled through the beam, make sure you haven’t damaged its protective coating. Cracks in the coating can lead to rusting around holes. At this stage, it’s smart to touch up the beam’s surface around holes before adding your bolts.

Step 4: Thread the Bolt Through
Push the two bolt ends through the holes and thread the nuts on each end of the U-bolt.

Step 5: Fasten the Nuts
It’s good to note that nut placement on a restraint will be different from a guide. If you’re working with a restraint, you’ll want to tighten the nuts on the bottom side of the beam.

For guides, you’ll want to place one nut on the top side of the beam and one nut on the bottom side. These nuts allow proper spacing between the piping and U-bolt.

Once your nuts are in place, start by hand tightening the nuts closest to the beam first. Finally, tighten each end’s second nut. This will lock the U-bolt in place. Then, use a power tool or wrench to tighten the nuts until they’re secure.

 

Please browse our stainless steel U bolts selection below,

How to install and use U Bolt

Stainless Steel U Bolt TPN Type with 2 Plates & Nuts

 

 

More stainless steel U bolts

 

Si vos postulo adiuvare ius determinandum aut ecclesiam tuam application mole, e-mail nostrae peritossales@lg-lifting.com ad auxilium. 🙂

How To Plan A Shade Sail Structure – Shade Sail Installation

How To Plan A Shade Sail Structure – Shade Sail Installation

 

How To Plan A Shade Sail Structure?

Sunshade sails can be placed in a variety of ways:

  1. Horizontally,where all corners are at the same height;
  2. Vertically,like a privacy fence;
  3. Slants & Angles with overlapping sails;
  4. Or,where some corners are high and some low.

 

You probably already have an idea of what you want to cover or what you want to design.If you haven’t decided yet, here are some ideas for a single or multiple design looks.

 

 

A horizontal sail can be boring to look at, while a totally vertical sail could catch more wind and could produce heavier loads.

The most visually appealing situation is when two or more shade sails are used and the mounting elevations of the sails change dramatically from corner to corner.

Setting mounting points 3ft or more change in height makes for a visually stunning look.

Prior to installation, check with local authorities for any relevant building regulations which may exist, and check with the local utility companies for any underground services prior to digging holes for the support posts.

Where To Place The Shade Sail?

Before you commence installation, it is very important that you consider the most suitable location for your shade sails. Take into account the following:

  1. Size of the shade sail(s);
  2. Strength of existing structures intended to be anchor points;
  3. Ability to insert suitable fixing posts;
  4. Location of barbecue grills, fire pits, and other high heat sources;
  5. Sun direction and path tracking;
  6. Wind speeds typical and maximum expected for your area.

 

Find a suitable anchor point for each corner of the shade sail, such as those listed below. These need to be strong enough to take the strain of the shade sail material when tensioned.
Anchor points could be:

  1. A wall or strong beam
  2. A suitable tree
  3. A wooden post at least 100mm diameter set in the ground.
  4. A metal pole at least 48mm diameter set in the ground.
  5. A metal pole at least 48mm diameter fitted into a sleeve in the ground, like a rotary washing line.

Fixing points should be at least 7ft 10inches above the ground, and it is extremely important that these are sufficiently strong to take the full weight of the shade sail in windy conditions.

The wind can add significantly to the stress of the shade sail on any fixings, so it is vital to be certain that they can stand the additional drag.
NB: If you have any doubts you should take advice from a builder or structural engineer.

Posts

If you need to install posts, these should be 48mm wide galvanised steel which is 4mm thick (these can be easily painted if required).

Posts should be angled away from the centre of the shade sail by at least 10 degrees to provide additional strength and stability.

Footings
Footings for posts for shade sails up to 16ft 5inches should be 400mm square and 800mm deep and this should increase to 400mm x 1200mm for larger sizes.

Foundations
Concrete
Concrete should be well packed down around the post and sloping slightly outwards at the top to ensure water does not collect around the post. This should be left for a minimum of 48 hours to allow it to set completely before you attach the shade sail. We do not recommend the use of rapid set concrete.
1. Firm ground
Lay a 100mm depth of 20mm gravel at the base of the post. Add concrete and brace post on the angle.
2. Soft ground
Pour a 100mm depth of concrete at the bottom of the hole to provide a solid pad. Allow this to set. Add the gravel at the base of the post. Add concrete and brace post on the angle.

Wall

Once you have decided on a suitable site, the shade sail should be laid out in position on the ground allowing an additional 10% at each corner for tensioning.

For larger gaps you may require stainless steel cable or similar to reach more distant fixing points.

Trees

If you decide to use a tree as a fixed point, it should be at least 250mm in diameter.

How To Set It Up?

Some possible combinations of fixing accessories

Connecting the sail shade
Connect fixing accessories to your mounting points as required.Ensure all accessories face towards the middle of the sail and are tightly secured.

Tensioning
To connect your sail shade you should first attach the adjustable fixings to the mounting points(ensuring they face the centre of the sail shade),and then attach the sail shade to these,using a strap temsioner to stretch the sail shade as tightly as possible,replacing this with a turnbuckle for final tensioning and adjustment.

Please browse our shade sail hardware selection below,

Important : at least two of the sail’s fixing accessories must be tensioning devises.

A rope or chain can be used extend you shade sail to a fixing point if required.Select the fixing accessories which best suit your own installation.


Stainless Steel Commercial Turnbuckle Hook/Hook European frame type China manufacturer supplier

Trunbuckle : To attach shade sail corner ring to a fixing point and provide tension on the shade sail.


Stainless Steel D Shackle

& pe dica : Use to link shade sail corner to pad eye or eye bolt.


Stainless Steel Diamond Pad Eye Plate

Pad eye : To attach shade sail corner ring to a wall in conjunction with D shackle.


s hook stainless steel

S hook : Use to link shade sail corner to pay eye or eye bolt.


Plain Eye Bolt

Eye bolt : To attach shade sail corner ring through a thimber stud,steel pole or slid support.


Snap Hook DIN5299 Form C Stainless Steel

Snap hook : Used to link shade sail corner to pad eye or tempcrary use.


Stainless Steel 304/316 Swage Jaw Terminal swage socket

Terminals : We offer a range of terminals that are safe, reliable, and do not require any specialised swaging or crimping tools.


Stainless Steel Rigging Screws Jaw To Swage Stud aisi 316 China manufacturer supplier

Rigging screws : Rigging screws are designed to conceal the threads within the pipe for a better, more streamlined appearance to your shade sail rigging,designed to attach to a wide range of stainless steel fixtures and fittings, such as screw eyes and eye bolts.


Shade Sail Hardware Kit Mounting Hardware Stainless Steel China manufacturer

Shade Sail Hardware Kit :

Triangle type set includes:2 x Turn Buckles,3 x Pad Eyes,3 x Carabiner,12 x Screws for fixing eye plates;
Square type set includes:2 x Turn Buckles,4 x Pad Eyes,2 x Carabiner,16 x Screws for fixing eye plates.


 

 

 

Si vos postulo adiuvare ius determinandum aut ecclesiam tuam application mole, e-mail nostrae peritossales@lg-lifting.com ad auxilium. 🙂

PONDUS FINIS excedere ipsam EXERCITUS

PONDUS FINIS excedere ipsam EXERCITUS

 

 

Showing working Lond
Hic est terminus usus est in catalogo. Sunt tamen. Aliis verbis usus est in industria est quod convertitur cum illo termino Opus Lond Limit. Hi sunt: ​​WLL, SWL donetur Opus Lond Rated Lond eae, unde Tutus Opus Lond et Rated capacitatem.

 

Numquam excedet operario dedicabitur Lond Limit.

Lond, terminus intellegitur operario dedicabitur maximam semper onus quod sit applicari potest ad uber, etiam cum productum est nova et quando onus est uniformiter applicari - traho linea recta tantum. MCTD vitandum. Aliquam catalogo omnium rating innituntur solent conditiones pro ea causa mali detur summa sublimis aut humilis temperaturis eget neque solutionum vaporum immersionem salsa protractam, etc. necessitant reducendo conditiones summum periculum applicationes working Lond Limit.

 

Welding modificationes et retineas operario dedicabitur Lond Low

Lond Hi erunt termini in opus non est, si productum est iuncta fuit aut aliter immutabile est. Est etiam attendendum quod pertinet ad ultimum finem user determinare modum per applicationem ad Opus Lond.

 

Opus components Lond limites oportet inserere.

Fac quod components ut quaedam earum palmi unius nexus et vincula, et cetera ad usus filum funem (vel torque aut Eurusque Notusque ruunt) sunt fortitudinem et oportunitate idonea sit materia mole providere sufficiens praesidium salutem. Et attachiamenta que debet installed recte debet habere terminum; Opus Lond minimis aequalis est producto ex quibus sunt. Duis nisi alicuius vinculi velut ad infima.

 

Erexit onus.

Omnia plenis aut conductos aut cooperante auxilio grues vel in disponendis hooking sub onere debet tenere de onere. Salutem ex parte una momenti existit, compositius cuncta opera debuit ita ut paratu si peccatum est personas laederetur. Sub hoc abstinere elevatum linea vim arcerent oneri onus.

 

Loads inpulsa.

Vitare Impacting, aut raptas cum operario dedicabitur inclinata est onus Lond finis imponi posset, exceditur modus non est cum opere Lond. A onus inpulsa est significantly maior quam vulgo Vestibulum consectetuer. Vitare inpulsa onerat.

 

Inspicere productum semper.

Nulla uber ut can operating ad eius rated facultatem mensuras accipiunt. Inspectiones periodica auxilium determinare quod productum ac reponere ad redigendum menta fortuita. Visibilium reprehendo damno rimas lapsum, formi demolitur etc. dubitaret magnitudinem nocumenti item illud immediate recipere.

Tales non comminuit, et deficere faciam onerat fabrefacta et imperium, nusquam fit injuria in grave damnum vel mors est ut major res.

 

Ergo:

➡ numquam excedet operario dedicabitur Lond Limit (WLL).

➡ recte Match components.

Et erexit in ➡ Keep ex onus.

Vitare ➡ inpulsa onerat.

Inspice ➡ products regulariter.

Other filum funem, installation,

Other filum funem, installation,

 

 

Filum funem clips late usi sunt, pro fine habeant. Sunt duo basic clips available in cogitationes; a U-pugnus fulmine et tenaci. In efficientiam ex utrisque tamen idem est.
Fulmen utentes u video, quoniam ad extrema diligentia adhibeatur affiguntur recte Non recta institutionem per modum potest reducere onus opus XL%. Infra sunt guidelines pro generalis installing clips filum funem.

 

Primum filum funem clips considerare oportet uti ut prius:

• quae omnia notis legi;
• filum funem enim a clip nicks, gonges et rimas;
• de filum funem clip cum rectam rationem est electus;
• filum funem est non reparatione vel reshape clip a welding, calefacit aut ista quasi mittens enim haec ut afficit perficientur.

 

Et postea, quod haec fundatur in magnitudine propriis uti U fulmen-on new clips funem.

1. Convertimini certa gradum tantum aut funem de thimble loop. Primum video ponendum unum pontem latitudinem a retro funis cauda mortuorum finem funem Adhibe U fulmen exanimatis finem filum funem - vivunt fine quiescit in tapetibus (non sterneret equus mortuus) Tighten nuces aequaliter altero ex eo ad alium nucis torque suadeo.

2. Cum clips gradum ultra duo requiruntur, secundum clip applicare pro loop vel prope thimble fieri sed nondum ad obstringere in nucis firmiter certa torque.

3. Et tres sunt gradus, vel magis requiritur clips, additional spatium inter primos duos aeque clips - ut funem est inutilis - nucis in se obstringere fulmine U-paribus alternis nut ab uno ad alterum suadetur eo ad torque.

4. Primo gradu onere ingrediatur ecclesiam experiri. Paris maiori fasce foret - pondere usus onera exspectatur. Secundo commendatur torque frenare retighten nuces.

Nunc vero, ea bonis et funibus extrahebat sustentationem exercitia, ultimum finem filum funem per considerare oportet periodice habent, abusu et dux adaequationis. Periodice-tensis de re agenda sit nucis cycles 10.000 (gravibus usus), eg 20.000 omnis III menses, VI menses annuatim.

 

Item, in constrictorium et restrictorium versus retightening in nucis peragenda Quod erat faciendum.
Video in discrimine sed falso utuntur gravis officium medium onera sustinere tales lineas huic lineae rectae remulco, iie deorsum scaffolds etc.
Terminus ad oculum video causae coetus tantum recte adhibeatur iusto minorem usum laicorum officium lucem ac filum funem De onera sua sicut cancellos claudendi custos fulcra etc.

 

Lumen gentium Sinis Supple qualis non alta providere filum funem clipsIn a range de magnitudinum et consilia, perspicienda; secundum ad indigentias vel desideria manifestemus.

egdin741 oboediens filum funem clip,CDL g-falsas etiam filum funem clips, immaculatam ferro filum funem clips.